Test and Measurement
5G Toolbox™ provides waveform generation and analysis capabilities.
Generate, impair, and visualize uplink and downlink waveforms, test models, and FRCs programmatically or by using the 5G Waveform Generator app.
Analyze waveform quality and obtain metrics. For example, you can measure error vector magnitude (EVM), adjacent channel leakage ratio (ACLR), and obtain quality metrics based on channel state information reference signals (CSI-RS).
Perform carrier aggregation (CA): generate, aggregate, and demodulate multiple 5G NR carriers.
Apps
5G Waveform Generator | Create, impair, visualize, and export 5G NR waveforms |
Functions
Topics
- 5G NR Waveform Generation
Get an overview of 5G NR waveform generation workflows and the waveform types that you can generate.