how can calculate rise time, peak time,overshoot, setlling time
321 views (last 30 days)
Show older comments
2 Comments
Meenakshi RM
on 5 Aug 2022
Hi Hind ali, May I know how you found the time domain specifications for the above plot? It would be much helpful for my work.
Thanks,
Meenakshi
Accepted Answer
More Answers (1)
Jay Patel
on 24 Jul 2019
Hi,
Please use below matlab inbuild function on your dynamic system model function.
S = stepinfo(sys) % where sys is dynamic system model
you can also manually set the settling time and rising time thresold if you want. For example :
sys = tf([1 5 5],[1 1.65 5 6.5 2]); % Transfer function
S1 = stepinfo(sys,'SettlingTimeThreshold',0.005); % set SettlingTimeThreshold to 0.5%, or 0.005
st1 = S1.SettlingTime;
S2 = stepinfo(sys,'RiseTimeThreshold',[0.05 0.95]); %set RiseTimeThreshold to a vector containing those bounds
I hope this would help.
Jay