Multi-unit production planning with continuous variables (absolute distance penalty)

Version 1.0.0.0 (25.9 KB) by SKS Labs
An optimization test suite involving 1287 and 2624 continuous variables
23 Downloads
Updated 19 Jun 2018

This submission can be used to evaluate the performance of optimization techniques on problems with integer and continuous variables. This optimization problem arises for maximization of profit in production planning. However these files can be used as black-box optimization problems.

There are eight minimization optimization problems in this suite (case1.p, case2.p, case3.p, case4.p, case5.p, case6.p, case7.p and cas8.p).

Case 1, Case 2, Case 5 and Case 6 have a problem dimension of 1287 continuous variables whereas Case 3, Case 4, Case 7 and Case 8 have a problem dimension of 2624 continuous variables.

Each of them follows absolute distance penalty approach and has the following format

[ F ] = case1(X);
Input: population (or solution, denoted by X) and its
Output: objective function values (F) of the population members.

The file ProblemDetails.p can be used to determine the lower and upper bounds along with the function handle for each of the cases.

The format is [lb, ub, fobj] = ProblemDetails(n);

Input: n is an integer from 1 to 8.
Output: (i) the lower bound (lb),
(ii) the upper bound (ub), and
(iii) function handle (fobj).

The file Script.m shows how to use these files along with an optimization algorithm (SanitizedTLBO).

Note:
(i) The absolute distance penalty comes in while handling domain hole constraint, which is the minimum between absolute of Xj and (Xj-lj). Here Xj refers to the jth dimension of solution and lj refers to minimum non-zero production level.

(ii) Case 1 - 4 have the same problem structure but employ different data; Case 5 - 8 has same set of data as compared to Case 1 - 4, but do not employ a certain feature (flexible) of the problem.

(iii) The objective function files are capable of determining the objective function values of multiple solutions (i.e., if required, the entire population can be sent to the objective function file).

Reference: Sandeep Singh Chauhan, Prakash Kotecha,An efficient multi-unit production planning strategy based on continuous variables, Applied Soft Computing,2018,ISSN 1568-4946, https://doi.org/10.1016/j.asoc.2018.03.012.

Cite As

SKS Labs (2024). Multi-unit production planning with continuous variables (absolute distance penalty) (https://github.com/SKSLAB/Multi-unit-production-planning-with-continuous-variables-absolute-distance-penalty), GitHub. Retrieved .

MATLAB Release Compatibility
Created with R2015a
Compatible with any release
Platform Compatibility
Windows macOS Linux
Tags Add Tags

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Versions that use the GitHub default branch cannot be downloaded

Version Published Release Notes
1.0.0.0

To view or report issues in this GitHub add-on, visit the GitHub Repository.
To view or report issues in this GitHub add-on, visit the GitHub Repository.