Grid Synchronization | Evaluating Microgrid Control with Simscape Electrical, Part 4
From the series: Evaluating Microgrid Control with Simscape Electrical
Patrice Brunelle, Hydro Quebec
Graham Dudgeon, MathWorks
In a three-phase electrical power system, if two grids are connected that do not have a synchronized voltage magnitude, frequency and phase, then large current inrush will occur that can damage equipment and compromise system safety and security. Learn how to match microgrid voltage magnitude, frequency and phase with utility grid voltage magnitude, frequency and phase, to minimize current inrush when connecting to the utility grid.
Published: 13 Jun 2022
Download Code and Files
Related Products
Learn More
Select a Web Site
Choose a web site to get translated content where available and see local events and offers. Based on your location, we recommend that you select: .
You can also select a web site from the following list
How to Get Best Site Performance
Select the China site (in Chinese or English) for best site performance. Other MathWorks country sites are not optimized for visits from your location.
Americas
- América Latina (Español)
- Canada (English)
- United States (English)
Europe
- Belgium (English)
- Denmark (English)
- Deutschland (Deutsch)
- España (Español)
- Finland (English)
- France (Français)
- Ireland (English)
- Italia (Italiano)
- Luxembourg (English)
- Netherlands (English)
- Norway (English)
- Österreich (Deutsch)
- Portugal (English)
- Sweden (English)
- Switzerland
- United Kingdom (English)
Asia Pacific
- Australia (English)
- India (English)
- New Zealand (English)
- 中国
- 日本Japanese (日本語)
- 한국Korean (한국어)